Full build :  2-lane cricket practice net facility

St Josephs School

Bardon, Brisbane

WORKS CARRIED OUT

  • determination of suitable location as space was limited

  • full design of structure to meet school's requirements

  • earthworks  (including material removed from site)

  • full concrete slab construction

  • supply and installation of 'heavy duty' synthetic grass  (2.8 m x full length)

  • supply and installation of galvanised poles

  • supply and installation of tensioned soft netting

  • netting fully sewn onto stainless steel cable at top for added durability and to prevent sagging

  • netting fully sewn onto stainless steel cable at bottom for added durability

  • supply and installation of black PVC coated chain mesh fencing to gate

Show More

PREMIER CRICKET NET CONSTRUCTION

1/ 33 South Pine Road

Brendale   Qld   4500

Brisbane Northside

ABN 30 105 552 550

        2020  Premier Cricket Pty Ltd

CONTACT

Rick Heilbronn

M  0408 157 108

This site was designed with the
.com
website builder. Create your website today.
Start Now